ADS AUTOMATION · DESIGN · LUXEMBOURG
Industrial electrical installation for an egg processing facility
Project carried out in Luxembourg as part of the construction of an egg sorting center. ADS Automation provided the implementation of industrial electrical infrastructure, from the general power supply to the distribution of power to the various equipment in the building.
400 A
General nutrition.
400 V + N
Power distribution.
Presentation of project
He was project concerned with the construction of the electrical infrastructure for a new egg sorting center intended for the processing and packaging of the production.
ADS Automation provided the implementation of the general power supply, the construction of the cable routes, the electrical distribution, and the connection of the various equipment necessary for the operation of the site.
Scope of work
- Realization of the electrical architecture.
- Power distribution system.
- Implementation of cable routes.
- Realization of equipotential connections and earthing
- Commissioning electrical installations.
Project Overview
Location
Luxembourg
Installation
Egg sorting center
FOOD
400V – 400A
Construction site gallery








ADS AUTOMATION · YOUR PROJECT
Need support for an industrial project?
Tell us about your installation, production requirements and project objectives. We will help you define the most appropriate technical approach.
